Welcome to OLMR !

Long Down Coats & Parkas

Women's Curved-Quilted Mid-Length Down Hooded Coat

This mid-length down coat is filled with 90% premium duck down, offering lightweight and long-lasting warmth for cold winter days. It features ribbed windproof cuffs to lock in heat and a neckline with windproof buttons for added protection. Available in sizes from S to XL, with a down filling weight ranging from 219g to 237g, it ensures a cozy and stylish fit for all-day wear.

  • 90% high-purity duck down filling for exceptional warmth

  • Unique curved quilting pattern for a contemporary, textured look

  • Functional hood with adjustable drawstrings for personalized fit

  • Smooth, durable fabric with a refined finish

  • Available in four sophisticated color options


Women's Curved-Quilted Mid-Length Down Hooded Coat

Crafted with premium 90% down filling, this jacket delivers exceptional warmth without extra bulk. 

The lightweight design ensures all-day comfort while maintaining a slim, stylish fit, perfect for cold winter days



Women's Short Waist-Adjustable Hooded Down Jacket


Lightweight yet structured for all-day comfort

Perfect balance of warmth and shape

Women's Curved-Quilted Mid-Length Down Hooded Coat

Women's Curved-Quilted Mid-Length Down Hooded Coat


Women's Long Quilted Down Coat with Fur Collar

Professional anti-down leakage technology

dense fabric and precise stitching effectively prevent down from escaping, 

keeping the jacket clean and warm all day long.

High-quality YarnSpinning First, ThenFilling Down

Thinner Needle HolesHigh-density WeaveGerman-importedFine Fiber LinerSmall Needles



Women's Short Waist-Adjustable Hooded Down Jacket




Women's winter fashion short thickened duck down coat


PRODUCTS DESCRIPTION


Shell:100%Polyester 

 ----------------------------------------------------------------------

Lining:100%Polyester

----------------------------------------------------------------------

Fillng:90%Duck Down,10%Feather

----------------------------------------------------------------------

Women's Curved-Quilted Mid-Length Down Hooded Coat

Women's Curved-Quilted Mid-Length Down Hooded Coat

Women's Curved-Quilted Mid-Length Down Hooded Coat

Women's Curved-Quilted Mid-Length Down Hooded Coat

Women's Curved-Quilted Mid-Length Down Hooded Coat

Women's Curved-Quilted Mid-Length Down Hooded Coat

Women's Curved-Quilted Mid-Length Down Hooded Coat

Women's Curved-Quilted Mid-Length Down Hooded Coat

Women's Curved-Quilted Mid-Length Down Hooded Coat

Women's Curved-Quilted Mid-Length Down Hooded Coat

Women's Curved-Quilted Mid-Length Down Hooded Coat


Contact Details

Contact Details

Tel: +86 138 0110 8695

E-mail: olmereplus@gmail.com

WhatsApp:+8618001181177 or +1(530)9796597

Add.:Room 6039, GuoYa Building, ChaoYang district, Beijing, China

Send Inquiry

Send Inquiry

Copyright @ OLMR. All Rights Reserved| Sitemap | Powered by Reanod
Links: