Cotton padded coat
This short padded jacket is crafted with premium thick padding, offering long-lasting warmth for cold winter days. It features ribbed windproof cuffs to lock in heat and prevent cold air from entering. Available in sizes from L to 4XL, with a filling weight ranging from 449g to 510g, it ensures a cozy and inclusive fit for all-day wear.
Premium thick padding for exceptional warmth
Unique curved quilting pattern for a textured, modern look
Oversized hood with adjustable drawstrings for wind protection
Relaxed fit for easy layering and all-day comfort
Available in four versatile color options


Premium fabric offers exceptional softness and comfort against the skin
Windproof and durable, it provides long-lasting warmth without feeling heavy.
The smooth, breathable material ensures all-day comfort, making it perfect for daily wear in cold weather

This warm cotton-padded jacket is lightweight and windproof
Soft fabric, comfortable fit, perfect for cold days









RELATED PRODUCTS
Navigation
Navigation
Contact Details
Send Inquiry
Send Inquiry